{"help": "https://dp.lowcarboncontracts.uk/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "fdaf09d2-8cff-4799-a5b0-1c59444e492b", "total_estimation_threshold": null, "records": [{"_id":1,"CFD_ID":"AAA-ACH-183","Name_of_CFD_Unit":"Achlachan Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"10.000"},{"_id":2,"CFD_ID":"AAA-BAD-185","Name_of_CFD_Unit":"Bad A Cheo Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"26.340"},{"_id":3,"CFD_ID":"AAA-BAN-189","Name_of_CFD_Unit":"Kype Muir Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"87.230"},{"_id":4,"CFD_ID":"AAA-BAN-190","Name_of_CFD_Unit":"Moor House Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"11.960"},{"_id":5,"CFD_ID":"AAA-BAN-192","Name_of_CFD_Unit":"Middle Muir Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"50.730"},{"_id":6,"CFD_ID":"AAA-BRE-177","Name_of_CFD_Unit":"Brenig Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"37.600"},{"_id":7,"CFD_ID":"AAA-CAM-197","Name_of_CFD_Unit":"Triangle Farm Solar Park","Allocation_Round":"Allocation Round 1","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"10.900"},{"_id":8,"CFD_ID":"AAA-CLO-186","Name_of_CFD_Unit":"Clocaenog Forest Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"95.680"},{"_id":9,"CFD_ID":"AAA-COI-196","Name_of_CFD_Unit":"Coire Na Cloiche Windfarm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"30.000"},{"_id":10,"CFD_ID":"AAA-COM-191","Name_of_CFD_Unit":"Common Barn Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"6.070"},{"_id":11,"CFD_ID":"AAA-DOR-182","Name_of_CFD_Unit":"Dorenell Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"173.700"},{"_id":12,"CFD_ID":"AAA-ENE-171","Name_of_CFD_Unit":"Energy Works (Hull)","Allocation_Round":"Allocation Round 1","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"25.000"},{"_id":13,"CFD_ID":"AAA-ENV-169","Name_of_CFD_Unit":"Enviroparks Hirwaun Generation Site","Allocation_Round":"Allocation Round 1","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"11.000"},{"_id":14,"CFD_ID":"AAA-GEN-188","Name_of_CFD_Unit":"Wren Power and Pulp","Allocation_Round":"Allocation Round 1","Technology_Type":"Energy from Waste","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"49.750"},{"_id":15,"CFD_ID":"AAA-K3C-180","Name_of_CFD_Unit":"K3 CHP Facility","Allocation_Round":"Allocation Round 1","Technology_Type":"Energy from Waste","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"45.000"},{"_id":16,"CFD_ID":"AAA-LIG-176","Name_of_CFD_Unit":"Charity Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"11.940"},{"_id":17,"CFD_ID":"AAA-MYN-178","Name_of_CFD_Unit":"Mynydd Y Gwair Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"32.215"},{"_id":18,"CFD_ID":"AAA-NAN-184","Name_of_CFD_Unit":"Nanclach Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"39.100"},{"_id":19,"CFD_ID":"AAA-NEA-195","Name_of_CFD_Unit":"Neart na Gaoithe","Allocation_Round":"Allocation Round 1","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2025-02-28 00:00:00.0000000","Maximum_Contract_Capacity_MW":"448.000"},{"_id":20,"CFD_ID":"AAA-PNE-187","Name_of_CFD_Unit":"Tralorg Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2020-10-13 00:00:00.0000000","Maximum_Contract_Capacity_MW":"18.684"},{"_id":21,"CFD_ID":"AAA-REG-175","Name_of_CFD_Unit":"Netley Landfill Solar","Allocation_Round":"Allocation Round 1","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"12.000"},{"_id":22,"CFD_ID":"AAA-ROY-172","Name_of_CFD_Unit":"BHEG Walsall","Allocation_Round":"Allocation Round 1","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"23.400"},{"_id":23,"CFD_ID":"AAA-SNE-179","Name_of_CFD_Unit":"Sneddon Law Community Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2024-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"29.813"},{"_id":24,"CFD_ID":"AAA-SOL-181","Name_of_CFD_Unit":"Solwaybank Wind Farm","Allocation_Round":"Allocation Round 1","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2020-11-27 00:00:00.0000000","Maximum_Contract_Capacity_MW":"29.930"},{"_id":25,"CFD_ID":"AR2-DRK-414","Name_of_CFD_Unit":"Drakelow Renewable Energy Centre","Allocation_Round":"Allocation Round 2","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"15.000"},{"_id":26,"CFD_ID":"AR2-GRN-401","Name_of_CFD_Unit":"Grangemouth Renewable Energy Plant","Allocation_Round":"Allocation Round 2","Technology_Type":"Dedicated Biomass","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"85.000"},{"_id":27,"CFD_ID":"AR2-HRN-106","Name_of_CFD_Unit":"Hornsea Project 2 Phase 1","Allocation_Round":"Allocation Round 2","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2024-03-28 00:00:00.0000000","Maximum_Contract_Capacity_MW":"449.760"},{"_id":28,"CFD_ID":"AR2-HRN-206","Name_of_CFD_Unit":"Hornsea Project 2 Phase 2","Allocation_Round":"Allocation Round 2","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2024-03-28 00:00:00.0000000","Maximum_Contract_Capacity_MW":"454.560"},{"_id":29,"CFD_ID":"AR2-HRN-306","Name_of_CFD_Unit":"Hornsea Project 2 Phase 3","Allocation_Round":"Allocation Round 2","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2024-03-28 00:00:00.0000000","Maximum_Contract_Capacity_MW":"453.920"},{"_id":30,"CFD_ID":"AR2-IFI-410","Name_of_CFD_Unit":"IPIF Fort Industrial REC","Allocation_Round":"Allocation Round 2","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2022-03-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"10.200"},{"_id":31,"CFD_ID":"AR2-MRY-107","Name_of_CFD_Unit":"Moray Offshore Windfarm (East) Phase 1","Allocation_Round":"Allocation Round 2","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2024-03-04 00:00:00.0000000","Maximum_Contract_Capacity_MW":"309.469"},{"_id":32,"CFD_ID":"AR2-MRY-207","Name_of_CFD_Unit":"Moray Offshore Windfarm (East) Phase 2","Allocation_Round":"Allocation Round 2","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2024-03-04 00:00:00.0000000","Maximum_Contract_Capacity_MW":"309.363"},{"_id":33,"CFD_ID":"AR2-MRY-307","Name_of_CFD_Unit":"Moray Offshore Windfarm (East) Phase 3","Allocation_Round":"Allocation Round 2","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2024-03-04 00:00:00.0000000","Maximum_Contract_Capacity_MW":"318.770"},{"_id":34,"CFD_ID":"AR2-NTC-404","Name_of_CFD_Unit":"Northacre Renewable Energy Centre","Allocation_Round":"Allocation Round 2","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"25.500"},{"_id":35,"CFD_ID":"AR2-PRO-005","Name_of_CFD_Unit":"Blackbridge TGS1 Limited","Allocation_Round":"Allocation Round 2","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"5.560"},{"_id":36,"CFD_ID":"AR2-RBL-412","Name_of_CFD_Unit":"Rebellion","Allocation_Round":"Allocation Round 2","Technology_Type":"Dedicated Biomass","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"0.640"},{"_id":37,"CFD_ID":"AR2-STY-002","Name_of_CFD_Unit":"Station Yard CFD 1","Allocation_Round":"Allocation Round 2","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"","Maximum_Contract_Capacity_MW":"0.050"},{"_id":38,"CFD_ID":"AR2-TKN-103","Name_of_CFD_Unit":"Triton Knoll Offshore Wind Farm Phase 1","Allocation_Round":"Allocation Round 2","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2021-05-17 00:00:00.0000000","Maximum_Contract_Capacity_MW":"216.600"},{"_id":39,"CFD_ID":"AR2-TKN-203","Name_of_CFD_Unit":"Triton Knoll Offshore Wind Farm Phase 2","Allocation_Round":"Allocation Round 2","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2021-07-05 00:00:00.0000000","Maximum_Contract_Capacity_MW":"207.200"},{"_id":40,"CFD_ID":"AR2-TKN-303","Name_of_CFD_Unit":"Triton Knoll Offshore Wind Farm Phase 3","Allocation_Round":"Allocation Round 2","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2023-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"423.700"},{"_id":41,"CFD_ID":"AR3-BEL-001","Name_of_CFD_Unit":"Bulwell Energy Limited","Allocation_Round":"Allocation Round 3","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2023-06-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"27.500"},{"_id":42,"CFD_ID":"AR3-CHW-002","Name_of_CFD_Unit":"Costa Head Wind Farm","Allocation_Round":"Allocation Round 3","Technology_Type":"Remote Island Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-MDD","Expected_Start_Date":"2028-06-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"16.320"},{"_id":43,"CFD_ID":"AR3-DLW-112","Name_of_CFD_Unit":"Druim Leathann Wind Farm Limited","Allocation_Round":"Allocation Round 3","Technology_Type":"Remote Island Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2030-10-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"49.500"},{"_id":44,"CFD_ID":"AR3-DP1-101","Name_of_CFD_Unit":"Dogger Bank A P1","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2026-11-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"302.400"},{"_id":45,"CFD_ID":"AR3-DP1-102","Name_of_CFD_Unit":"Dogger Bank A P2","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-01-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"441.000"},{"_id":46,"CFD_ID":"AR3-DP1-103","Name_of_CFD_Unit":"Dogger Bank A P3","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"456.600"},{"_id":47,"CFD_ID":"AR3-DP2-201","Name_of_CFD_Unit":"Dogger Bank B P1","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-01-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"302.400"},{"_id":48,"CFD_ID":"AR3-DP2-202","Name_of_CFD_Unit":"Dogger Bank B P2","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"441.000"},{"_id":49,"CFD_ID":"AR3-DP2-203","Name_of_CFD_Unit":"Dogger Bank B P3","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-07-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"456.600"},{"_id":50,"CFD_ID":"AR3-DP3-301","Name_of_CFD_Unit":"Dogger Bank C P1","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-07-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"302.400"},{"_id":51,"CFD_ID":"AR3-DP3-302","Name_of_CFD_Unit":"Dogger Bank C P2","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-07-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"441.000"},{"_id":52,"CFD_ID":"AR3-DP3-303","Name_of_CFD_Unit":"Dogger Bank C P3","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-07-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"456.600"},{"_id":53,"CFD_ID":"AR3-FWL-321","Name_of_CFD_Unit":"Forthwind","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2024-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"12.000"},{"_id":54,"CFD_ID":"AR3-HHW-001","Name_of_CFD_Unit":"Hesta Head Wind Farm","Allocation_Round":"Allocation Round 3","Technology_Type":"Remote Island Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-MDD","Expected_Start_Date":"2028-06-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"20.400"},{"_id":55,"CFD_ID":"AR3-SEW-101","Name_of_CFD_Unit":"Seagreen Phase 1","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"138.000"},{"_id":56,"CFD_ID":"AR3-SEW-102","Name_of_CFD_Unit":"Seagreen Phase 2","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-03-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"158.000"},{"_id":57,"CFD_ID":"AR3-SEW-103","Name_of_CFD_Unit":"Seagreen Phase 3","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2028-03-29 00:00:00.0000000","Maximum_Contract_Capacity_MW":"158.000"},{"_id":58,"CFD_ID":"AR3-SHB-101","Name_of_CFD_Unit":"Small Heath Bio Power Limited","Allocation_Round":"Allocation Round 3","Technology_Type":"Advanced Conversion Technology","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2024-12-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"6.100"},{"_id":59,"CFD_ID":"AR3-SOW-101","Name_of_CFD_Unit":"Sofia Offshore Wind Farm Phase 1","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"364.000"},{"_id":60,"CFD_ID":"AR3-SOW-102","Name_of_CFD_Unit":"Sofia Offshore Wind Farm Phase 2","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"420.000"},{"_id":61,"CFD_ID":"AR3-SOW-103","Name_of_CFD_Unit":"Sofia Offshore Wind Farm Phase 3","Allocation_Round":"Allocation Round 3","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"616.000"},{"_id":62,"CFD_ID":"AR3-UPL-123","Name_of_CFD_Unit":"Muaitheabhal Wind Farm","Allocation_Round":"Allocation Round 3","Technology_Type":"Remote Island Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Terminated","Expected_Start_Date":"2030-10-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"189.000"},{"_id":63,"CFD_ID":"AR4-ADS-700","Name_of_CFD_Unit":"Adstock","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2025-06-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"15.000"},{"_id":64,"CFD_ID":"AR4-ASF-700","Name_of_CFD_Unit":"Alfreton Solar Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2025-01-22 00:00:00.0000000","Maximum_Contract_Capacity_MW":"14.576"},{"_id":65,"CFD_ID":"AR4-AWF-610","Name_of_CFD_Unit":"Arecleoch Wind Farm Extension","Allocation_Round":"Allocation Round 4","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"74.100"},{"_id":66,"CFD_ID":"AR4-BCW-610","Name_of_CFD_Unit":"Broken Cross Wind Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Pre-FIC)","Expected_Start_Date":"2027-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"42.350"},{"_id":67,"CFD_ID":"AR4-BFL-910","Name_of_CFD_Unit":"Beaw Field","Allocation_Round":"Allocation Round 4","Technology_Type":"Remote Island Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Terminated","Expected_Start_Date":"2026-11-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"72.000"},{"_id":68,"CFD_ID":"AR4-BFS-700","Name_of_CFD_Unit":"Bracks Farm Solar Park","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2026-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"20.000"},{"_id":69,"CFD_ID":"AR4-BHL-700","Name_of_CFD_Unit":"Bunkers Hill","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2026-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"49.900"},{"_id":70,"CFD_ID":"AR4-BHS-700","Name_of_CFD_Unit":"BRYN HENLLYS Solar Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2025-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"26.300"},{"_id":71,"CFD_ID":"AR4-BRC-700","Name_of_CFD_Unit":"Brackley","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2026-06-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"20.000"},{"_id":72,"CFD_ID":"AR4-BRN-700","Name_of_CFD_Unit":"Braintree","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2025-12-17 00:00:00.0000000","Maximum_Contract_Capacity_MW":"26.000"},{"_id":73,"CFD_ID":"AR4-BSF-700","Name_of_CFD_Unit":"Brigstock Solar Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Pre-Start Date","Expected_Start_Date":"2027-11-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"49.900"},{"_id":74,"CFD_ID":"AR4-BSL-700","Name_of_CFD_Unit":"Basildon","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2025-06-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"15.000"},{"_id":75,"CFD_ID":"AR4-BSP-700","Name_of_CFD_Unit":"Bishampton Solar PV","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2025-01-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"30.000"},{"_id":76,"CFD_ID":"AR4-CCP-700","Name_of_CFD_Unit":"Corner Copse","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Pre-Start Date","Expected_Start_Date":"2026-11-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"49.900"},{"_id":77,"CFD_ID":"AR4-CHS-700","Name_of_CFD_Unit":"Cowley House Solar Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Pre-Start Date","Expected_Start_Date":"2027-03-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"40.000"},{"_id":78,"CFD_ID":"AR4-CLF-700","Name_of_CFD_Unit":"CLIFTON","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2026-10-02 00:00:00.0000000","Maximum_Contract_Capacity_MW":"35.000"},{"_id":79,"CFD_ID":"AR4-CLH-710","Name_of_CFD_Unit":"Cleve Hill Solar Project","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Post-FIC)","Expected_Start_Date":"2025-11-03 00:00:00.0000000","Maximum_Contract_Capacity_MW":"109.790"},{"_id":80,"CFD_ID":"AR4-CLY-700","Name_of_CFD_Unit":"Claydon","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Pre-Start Date","Expected_Start_Date":"2026-09-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"45.000"},{"_id":81,"CFD_ID":"AR4-CNS-700","Name_of_CFD_Unit":"Carn Nicholas Solar Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2025-04-17 00:00:00.0000000","Maximum_Contract_Capacity_MW":"8.000"},{"_id":82,"CFD_ID":"AR4-CRN-700","Name_of_CFD_Unit":"Cornwell","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Pre-Start Date","Expected_Start_Date":"2026-06-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"35.000"},{"_id":83,"CFD_ID":"AR4-CSF-700","Name_of_CFD_Unit":"Cawarden Solar Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Pre-Start Date","Expected_Start_Date":"2026-12-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"35.710"},{"_id":84,"CFD_ID":"AR4-CSP-700","Name_of_CFD_Unit":"Cullerlie Solar PV","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2026-06-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"8.750"},{"_id":85,"CFD_ID":"AR4-CWF-610","Name_of_CFD_Unit":"Chirmorie Wind Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Terminated","Expected_Start_Date":"2026-03-26 00:00:00.0000000","Maximum_Contract_Capacity_MW":"81.600"},{"_id":86,"CFD_ID":"AR4-CWS-610","Name_of_CFD_Unit":"Cumberhead West","Allocation_Round":"Allocation Round 4","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"113.200"},{"_id":87,"CFD_ID":"AR4-DBF-700","Name_of_CFD_Unit":"Down Barn Farm Solar","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2025-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"40.000"},{"_id":88,"CFD_ID":"AR4-DRF-700","Name_of_CFD_Unit":"Driffield","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2026-01-15 00:00:00.0000000","Maximum_Contract_Capacity_MW":"30.000"},{"_id":89,"CFD_ID":"AR4-DVR-700","Name_of_CFD_Unit":"Doverdale","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2026-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"49.900"},{"_id":90,"CFD_ID":"AR4-DWE-610","Name_of_CFD_Unit":"Douglas West Extension","Allocation_Round":"Allocation Round 4","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Terminated","Expected_Start_Date":"2025-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"71.500"},{"_id":91,"CFD_ID":"AR4-EAS-011","Name_of_CFD_Unit":"EA3 Phase 1","Allocation_Round":"Allocation Round 4","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2027-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"288.910"},{"_id":92,"CFD_ID":"AR4-EAS-012","Name_of_CFD_Unit":"EA3 Phase 2","Allocation_Round":"Allocation Round 4","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2029-03-29 00:00:00.0000000","Maximum_Contract_Capacity_MW":"375.590"},{"_id":93,"CFD_ID":"AR4-EAS-013","Name_of_CFD_Unit":"EA3 Phase 3","Allocation_Round":"Allocation Round 4","Technology_Type":"Offshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-Start Date","Expected_Start_Date":"2029-03-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"390.030"},{"_id":94,"CFD_ID":"AR4-EGH-710","Name_of_CFD_Unit":"Enso Green Holdings K Limited","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Transmission","Status":"Pre-MDD","Expected_Start_Date":"2029-10-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"49.990"},{"_id":95,"CFD_ID":"AR4-EST-700","Name_of_CFD_Unit":"Eastfields","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2026-04-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"25.000"},{"_id":96,"CFD_ID":"AR4-FFN-700","Name_of_CFD_Unit":"FERRY FARM 3 NORTH","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Pre-Start Date","Expected_Start_Date":"2027-05-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"9.750"},{"_id":97,"CFD_ID":"AR4-HCS-700","Name_of_CFD_Unit":"High Cayton Solar PV","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Terminated","Expected_Start_Date":"2025-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"49.990"},{"_id":98,"CFD_ID":"AR4-HCW-610","Name_of_CFD_Unit":"High Constellation Wind Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Terminated","Expected_Start_Date":"2025-12-01 00:00:00.0000000","Maximum_Contract_Capacity_MW":"50.000"},{"_id":99,"CFD_ID":"AR4-HFS-700","Name_of_CFD_Unit":"Houndbeare Farm Solar Farm","Allocation_Round":"Allocation Round 4","Technology_Type":"Solar PV","Transmission_or_Distribution_connection":"Distribution","Status":"Live (Post-FIC)","Expected_Start_Date":"2026-06-30 00:00:00.0000000","Maximum_Contract_Capacity_MW":"10.000"},{"_id":100,"CFD_ID":"AR4-HHR-610","Name_of_CFD_Unit":"Hagshaw Hill Repowering","Allocation_Round":"Allocation Round 4","Technology_Type":"Onshore Wind","Transmission_or_Distribution_connection":"Transmission","Status":"Live (Pre-FIC)","Expected_Start_Date":"2027-03-31 00:00:00.0000000","Maximum_Contract_Capacity_MW":"79.800"}], "fields": [{"id": "_id", "type": "int"}, {"id": "CFD_ID", "type": "text"}, {"id": "Name_of_CFD_Unit", "type": "text"}, {"id": "Allocation_Round", "type": "text"}, {"id": "Technology_Type", "type": "text"}, {"id": "Transmission_or_Distribution_connection", "type": "text"}, {"id": "Status", "type": "text"}, {"id": "Expected_Start_Date", "type": "text"}, {"id": "Maximum_Contract_Capacity_MW", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=fdaf09d2-8cff-4799-a5b0-1c59444e492b", "next": "/api/3/action/datastore_search?resource_id=fdaf09d2-8cff-4799-a5b0-1c59444e492b&offset=100"}, "total": 612, "total_was_estimated": false}}