  "fields": [{"id":"_id","type":"int"},{"id":"Auction","type":"text"},{"id":"Version","type":"text"},{"id":"Publication_Date","type":"text"},{"id":"Technology_Groups","type":"text"},{"id":"Technology","type":"text"},{"id":"Year","type":"text"},{"id":"Administrative_Strike_Prices_GBP_Per_MWh","type":"text"},{"id":"Maxima","type":"text"},{"id":"Minima","type":"text"}],
  "records": [
    [578,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2014/15","100","",""],
    [579,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2015/16","80","",""],
    [580,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2018/19","100","",""],
    [581,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2016/17","80","",""],
    [582,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2018/19","80","",""],
    [583,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2016/17","100","",""],
    [584,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2017/18","80","",""],
    [585,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2014/15","80","",""],
    [586,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Onshore Wind (>5 MW)","2014/15","95","",""],
    [587,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Landfill Gas","2015/16","55","",""],
    [588,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Onshore Wind (>5 MW)","2018/19","90","",""],
    [589,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Landfill Gas","2016/17","55","",""],
    [590,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Landfill Gas","2018/19","55","",""],
    [591,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Onshore Wind (>5 MW)","2016/17","95","",""],
    [592,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Landfill Gas","2017/18","55","",""],
    [593,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Landfill Gas","2014/15","55","",""],
    [594,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2014/15","120","",""],
    [595,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Sewage Gas","2015/16","75","",""],
    [596,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2018/19","100","",""],
    [597,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Sewage Gas","2016/17","75","",""],
    [598,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Sewage Gas","2018/19","75","",""],
    [599,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2016/17","115","",""],
    [600,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Sewage Gas","2017/18","75","",""],
    [601,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Sewage Gas","2014/15","75","",""],
    [602,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2014/15","150","",""],
    [603,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2015/16","155","",""],
    [604,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2018/19","140","",""],
    [605,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2016/17","150","",""],
    [606,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2018/19","140","",""],
    [607,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2016/17","150","",""],
    [608,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2017/18","140","",""],
    [609,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2014/15","155","",""],
    [610,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2014/15","145","",""],
    [611,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2015/16","125","",""],
    [612,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2018/19","140","",""],
    [613,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2016/17","125","",""],
    [614,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2018/19","125","",""],
    [615,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2016/17","145","",""],
    [616,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2017/18","125","",""],
    [617,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2014/15","125","",""],
    [618,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Scottish Islands  onshore wind (>5MW)","2014/15","","",""],
    [619,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Offshore Wind","2015/16","155","",""],
    [620,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Scottish Islands  onshore wind (>5MW)","2018/19","115","",""],
    [621,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Offshore Wind","2016/17","150","",""],
    [622,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Offshore Wind","2018/19","140","",""],
    [623,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Scottish Islands  onshore wind (>5MW)","2016/17","","",""],
    [624,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Offshore Wind","2017/18","140","",""],
    [625,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Offshore Wind","2014/15","155","",""],
    [626,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Wave","2014/15","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [627,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Tidal Stream","2015/16","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [628,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Wave","2018/19","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [629,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Tidal Stream","2016/17","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [630,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Tidal Stream","2018/19","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [631,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Wave","2016/17","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [632,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Tidal Stream","2017/18","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [633,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Tidal Stream","2014/15","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [634,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2014/15","80","",""],
    [635,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 3","Biomass Conversion","2015/16","105","",""],
    [636,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2018/19","80","",""],
    [637,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 3","Biomass Conversion","2016/17","105","",""],
    [638,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 3","Biomass Conversion","2018/19","105","",""],
    [639,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2016/17","80","",""],
    [640,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 3","Biomass Conversion","2017/18","105","",""],
    [641,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 3","Biomass Conversion","2014/15","105","",""],
    [642,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Landfill Gas","2014/15","55","",""],
    [643,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2015/16","100","",""],
    [644,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Landfill Gas","2018/19","55","",""],
    [645,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2016/17","100","",""],
    [646,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2018/19","100","",""],
    [647,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Landfill Gas","2016/17","55","",""],
    [648,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2017/18","100","",""],
    [649,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2014/15","100","",""],
    [650,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Sewage Gas","2014/15","75","",""],
    [651,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2015/16","95","",""],
    [652,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Sewage Gas","2018/19","75","",""],
    [653,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2016/17","95","",""],
    [654,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2018/19","90","",""],
    [655,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Sewage Gas","2016/17","75","",""],
    [656,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2017/18","90","",""],
    [657,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2014/15","95","",""],
    [658,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2014/15","155","",""],
    [659,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2015/16","120","",""],
    [660,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2018/19","140","",""],
    [661,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2016/17","115","",""],
    [662,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2018/19","100","",""],
    [663,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2016/17","150","",""],
    [664,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2017/18","110","",""],
    [665,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2014/15","120","",""],
    [666,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2014/15","125","",""],
    [667,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2015/16","150","",""],
    [668,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2018/19","125","",""],
    [669,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2016/17","150","",""],
    [670,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2018/19","140","",""],
    [671,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2016/17","125","",""],
    [672,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2017/18","140","",""],
    [673,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2014/15","150","",""],
    [674,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Offshore Wind","2014/15","155","",""],
    [675,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2015/16","145","",""],
    [676,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Offshore Wind","2018/19","140","",""],
    [677,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2016/17","145","",""],
    [678,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2018/19","140","",""],
    [679,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Offshore Wind","2016/17","150","",""],
    [680,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2017/18","140","",""],
    [681,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2014/15","145","",""],
    [682,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Wave","2014/15","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [683,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Tidal Stream","2015/16","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [684,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Wave","2018/19","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [685,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Tidal Stream","2016/17","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [686,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Tidal Stream","2018/19","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [687,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Wave","2016/17","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [688,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Tidal Stream","2017/18","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [689,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Tidal Stream","2014/15","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [690,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2021/22","125","A cumulative maxima of 150 MW will be applied in respect of the fuelled technologies: Dedicated Biomass with CHP; Advanced Conversion Technologies (with or without CHP) and Anaerobic Digestion (with or without CHP).",""],
    [691,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 3","Biomass Conversion","2015/16","105","",""],
    [692,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2021/22","115","A cumulative maxima of 150 MW will be applied in respect of the fuelled technologies: Dedicated Biomass with CHP; Advanced Conversion Technologies (with or without CHP) and Anaerobic Digestion (with or without CHP).",""],
    [693,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 3","Biomass Conversion","2016/17","105","",""],
    [694,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 3","Biomass Conversion","2018/19","105","",""],
    [695,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2021/22","140","A cumulative maxima of 150 MW will be applied in respect of the fuelled technologies: Dedicated Biomass with CHP; Advanced Conversion Technologies (with or without CHP) and Anaerobic Digestion (with or without CHP).",""],
    [696,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 3","Biomass Conversion","2017/18","105","",""],
    [697,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 3","Biomass Conversion","2014/15","105","",""],
    [698,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Tidal Stream","2021/22","300","",""],
    [699,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2021/22","140","",""],
    [700,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2023/24","113","",""],
    [701,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2022/23","140","",""],
    [702,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Offshore Wind","2022/23","100","",""],
    [703,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Wave","2021/22","310","",""],
    [704,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Offshore Wind","2021/22","105","",""],
    [705,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2022/23","115","A cumulative maxima of 150 MW will be applied in respect of the fuelled technologies: Dedicated Biomass with CHP; Advanced Conversion Technologies (with or without CHP) and Anaerobic Digestion (with or without CHP).",""],
    [706,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2023/24","129","",""],
    [707,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2023/24","122","",""],
    [708,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Remote Island Wind (>5MW)","2023/24","82","",""],
    [709,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2024/25","121","",""],
    [710,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2024/25","121","",""],
    [711,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Offshore Wind","2023/24","56","",""],
    [712,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2023/24","121","",""],
    [713,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2024/25","111","",""],
    [714,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2023/24","121","",""],
    [715,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Tidal Stream","2023/24","225","",""],
    [716,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Landfill Gas","2023/24","62","",""],
    [717,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Tidal Stream","2024/25","217","",""],
    [718,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Wave","2024/25","268","",""],
    [719,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Hydro (>5MW and <50MW)","2023/24","93","",""],
    [720,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Wave","2023/24","281","",""],
    [721,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Remote Island Wind (>5MW)","2024/25","82","",""],
    [722,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Solar PV (> 5MW)","2023/24","47","3500 MW",""],
    [723,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2023/24","53","3500 MW",""],
    [724,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Anaerobic Digestion (> 5MW)","2025/26","128","",""],
    [725,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2024/25","53","3500 MW",""],
    [726,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Sewage Gas","2024/25","151","",""],
    [727,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Advanced Conversion Technologies (ACT)","2025/26","190","",""],
    [728,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Sewage Gas","2023/24","151","",""],
    [729,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Landfill Gas","2024/25","62","",""],
    [730,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Geothermal","2025/26","133","",""],
    [731,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2025/26","163","",""],
    [732,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Tidal Stream","2025/26","211","",""],
    [733,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2026/27","163","",""],
    [734,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Floating Offshore Wind","2026/27","122","","£24 million "],
    [735,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Remote Island Wind (> 5MW)","2025/26","62","",""],
    [736,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Floating Offshore Wind","2025/26","122","","£24 million "],
    [737,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Anaerobic Digestion (> 5MW)","2026/27","128","",""],
    [738,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2025/26","116","",""],
    [739,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Wave","2025/26","258","",""],
    [740,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Hydro (>5MW and <50MW)","2026/27","89","",""],
    [741,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Wave","2026/27","258","",""],
    [742,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 3","Offshore Wind","2026/27","46","",""],
    [743,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2027/28","116","",""],
    [744,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 3","Offshore Wind","2025/26","46","",""],
    [745,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Tidal Stream","2026/27","211","",""],
    [746,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Offshore Wind","2026/27","44","",""],
    [747,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Landfill Gas","2025/26","62","",""],
    [748,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2027/28","53","",""],
    [749,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Landfill Gas","2026/27","62","",""],
    [750,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Offshore Wind","2025/26","44","",""],
    [751,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2025/26","53","",""],
    [752,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Landfill Gas","2027/28","62","",""],
    [753,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Hydro (>5MW and <50MW)","2027/28","89","",""],
    [754,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Sewage Gas","2027/28","148","",""],
    [755,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Remote Island Wind (> 5MW)","2026/27","53","",""],
    [756,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Advanced Conversion Technologies (ACT)","2026/27","182","",""],
    [757,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Remote Island Wind (> 5MW)","2027/28","53","",""],
    [758,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Sewage Gas","2026/27","148","",""],
    [759,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Solar PV (> 5MW)","2026/27","47","",""],
    [760,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Sewage Gas","2025/26","148","",""],
    [761,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Remote Island Wind (> 5MW)","2025/26","53","",""],
    [762,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Floating Offshore Wind","2026/27","116","",""],
    [763,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Anaerobic Digestion (> 5MW)","2026/27","136","",""],
    [764,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Tidal Stream","2026/27","202","","£10 million"],
    [765,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Anaerobic Digestion (> 5MW)","2027/28","136","",""],
    [766,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2027/28","162","",""],
    [767,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Geothermal","2026/27","119","",""],
    [768,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2026/27","162","",""],
    [769,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Advanced Conversion Technologies (ACT)","2027/28","182","",""],
    [770,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Hydro (>5MW and <50MW)","2026/27","102","",""],
    [771,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Wave","2026/27","245","",""],
    [772,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2026/27","64","£120 million",""],
    [773,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Wave","2027/28","245","",""],
    [774,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2027/28","181","",""],
    [775,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Landfill Gas","2026/27","69","",""],
    [776,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2026/27","181","",""],
    [777,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Tidal Stream","2027/28","202","","£10 million"],
    [778,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Solar PV (> 5MW)","2026/27","61","£120 million",""],
    [779,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Remote Island Wind (> 5MW)","2026/27","64","£120 million",""],
    [780,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Anaerobic Digestion (> 5MW)","2027/28","144","",""],
    [781,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Remote Island Wind (> 5MW)","2027/28","64","£120 million",""],
    [782,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Sewage Gas","2027/28","162","",""],
    [783,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Advanced Conversion Technologies (ACT)","2027/28","210","",""],
    [784,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Sewage Gas","2026/27","162","",""],
    [785,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2027/28","64","£120 million",""],
    [786,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Geothermal","2027/28","157","£8 million",""],
    [787,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2027/28","179","",""],
    [788,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Wave","2027/28","257","",""],
    [789,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2028/29","179","",""],
    [790,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Floating Offshore Wind","2028/29","176","",""],
    [791,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Tidal Stream","2027/28","261","","£10 million"],
    [792,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Floating Offshore Wind","2027/28","176","",""],
    [793,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Anaerobic Digestion (> 5MW)","2028/29","144","",""],
    [794,"AR7","Final","2025-10-27 00:00:00.0000000","Pot 3","Offshore Wind","2030/31","113","",""],
    [795,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 3","Offshore Wind","2027/28","73","£800 million applied to Offshore \nWind Permitted Reduction1 projects and new Offshore Wind projects",""],
    [796,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2028/29","287","",""],
    [797,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 3","Offshore Wind","2028/29","73","£800 million applied to Offshore \nWind Permitted Reduction1 projects and new Offshore Wind projects",""],
    [798,"AR7","Final","2025-10-27 00:00:00.0000000","Pot 3","Offshore Wind","2029/30","113","",""],
    [799,"AR7","Final","2025-10-27 00:00:00.0000000","Pot 4","Floating Offshore Wind","2029/30","271","",""],
    [800,"AR7","Final","2025-10-27 00:00:00.0000000","Pot 3","Offshore Wind","2028/29","113","",""],
    [801,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Wave","2028/29","257","",""],
    [802,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2028/29","92","","160"],
    [803,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Hydro (>5MW and <50MW)","2028/29","168","",""],
    [804,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Sewage Gas","2028/29","228","",""],
    [805,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Landfill Gas","2027/28","94","",""],
    [806,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2027/28","92","","160"],
    [807,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Remote Island Wind (> 5MW)","2028/29","92","","160"],
    [808,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Landfill Gas","2028/29","94","",""],
    [809,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Hydro (>5MW and <50MW)","2027/28","168","",""],
    [810,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Anaerobic Digestion (> 5MW)","2029/30","195","",""],
    [811,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Solar PV (> 5MW)","2028/29","75","295",""],
    [812,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Geothermal","2029/30","219","",""],
    [813,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Advanced Conversion Technologies (ACT)","2028/29","307","",""],
    [814,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Anaerobic Digestion (> 5MW)","2028/29","195","",""],
    [815,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2029/30","238","",""],
    [816,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Advanced Conversion Technologies (ACT)","2029/30","307","",""],
    [817,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Solar PV (> 5MW)","2027/28","75","295",""],
    [818,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Tidal Stream","2029/30","371","",""],
    [819,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Wave","2028/29","386","",""],
    [820,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2017/18","100","",""],
    [821,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Wave","2029/30","386","",""],
    [822,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Tidal Stream","2028/29","371","",""],
    [823,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Onshore Wind (>5 MW)","2017/18","90","",""],
    [824,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2017/18","110","",""],
    [825,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2017/18","140","",""],
    [826,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2017/18","140","",""],
    [827,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Scottish Islands  onshore wind (>5MW)","2017/18","115","",""],
    [828,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Wave","2017/18","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [829,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2017/18","80","",""],
    [830,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Landfill Gas","2017/18","55","",""],
    [831,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Sewage Gas","2017/18","75","",""],
    [832,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2017/18","140","",""],
    [833,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2017/18","125","",""],
    [834,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Offshore Wind","2017/18","140","",""],
    [835,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Wave","2017/18","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [836,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2022/23","135","A cumulative maxima of 150 MW will be applied in respect of the fuelled technologies: Dedicated Biomass with CHP; Advanced Conversion Technologies (with or without CHP) and Anaerobic Digestion (with or without CHP).",""],
    [837,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Wave","2022/23","300","",""],
    [838,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Offshore Wind","2024/25","53","",""],
    [839,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Hydro (>5MW and <50MW)","2024/25","93","",""],
    [840,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Advanced Conversion Technologies (ACT)","2026/27","190","",""],
    [841,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Remote Island Wind (> 5MW)","2026/27","62","",""],
    [842,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Hydro (>5MW and <50MW)","2025/26","89","",""],
    [843,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Onshore Wind (> 5MW)","2026/27","53","",""],
    [844,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Solar PV (> 5MW)","2027/28","47","",""],
    [845,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Geothermal","2027/28","119","",""],
    [846,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Landfill Gas","2027/28","69","",""],
    [847,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Advanced Conversion Technologies (ACT)","2028/29","210","",""],
    [848,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Tidal Stream","2028/29","261","","£10 million"],
    [849,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2027/28","287","",""],
    [850,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Sewage Gas","2027/28","228","",""],
    [851,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Geothermal","2028/29","219","",""],
    [852,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Hydro (>5 MW and <50MW)","2015/16","100","",""],
    [853,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Onshore Wind (>5 MW)","2015/16","95","",""],
    [854,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 1","Solar Photo Voltaic (>5MW)","2015/16","120","",""],
    [855,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Anaerobic Digestion (with or without CHP) (>5MW)","2015/16","150","",""],
    [856,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2015/16","145","",""],
    [857,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Scottish Islands  onshore wind (>5MW)","2015/16","","",""],
    [858,"AR1","Draft","2014-09-29 00:00:00.0000000","Pot 2","Wave","2015/16","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [859,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2015/16","80","",""],
    [860,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Landfill Gas","2015/16","55","",""],
    [861,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 1","Sewage Gas","2015/16","75","",""],
    [862,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2015/16","155","",""],
    [863,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2015/16","125","",""],
    [864,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Offshore Wind","2015/16","155","",""],
    [865,"AR1","Final","2014-10-02 00:00:00.0000000","Pot 2","Wave","2015/16","305","","One minimum of 10MW for wave and tidal stream technologies (out of the 100MW reserved budget for this technology for the duration of the first Delivery Plan period) applies to this allocation round."],
    [866,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Advanced Conversion Technology (with or without CHP)","2022/23","115","A cumulative maxima of 150 MW will be applied in respect of the fuelled technologies: Dedicated Biomass with CHP; Advanced Conversion Technologies (with or without CHP) and Anaerobic Digestion (with or without CHP).",""],
    [867,"AR2","Final","2017-03-13 00:00:00.0000000","Pot 2","Tidal Stream","2022/23","295","",""],
    [868,"AR3","Final","2019-05-01 00:00:00.0000000","Pot 2","Geothermal (with or without CHP)","2024/25","127","",""],
    [869,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2024/25","121","",""],
    [870,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 1","Solar PV (> 5MW)","2024/25","47","3500 MW",""],
    [871,"AR4","Final","2021-09-13 00:00:00.0000000","Pot 2","Geothermal","2026/27","133","",""],
    [872,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Energy from Waste with CHP","2026/27","116","",""],
    [873,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Offshore Wind","2027/28","44","",""],
    [874,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 1","Solar PV (> 5MW)","2025/26","47","",""],
    [875,"AR5","Final","2022-12-14 00:00:00.0000000","Pot 2","Floating Offshore Wind","2027/28","116","",""],
    [876,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Hydro (>5MW and <50MW)","2027/28","102","",""],
    [877,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 1","Solar PV (> 5MW)","2027/28","61","£120 million",""],
    [878,"AR6","Final","2024-03-06 00:00:00.0000000","Pot 2","Geothermal","2028/29","157","£8 million",""],
    [879,"AR7","Final","2025-10-27 00:00:00.0000000","Pot 4","Floating Offshore Wind","2028/29","271","",""],
    [880,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 1","Remote Island Wind (> 5MW)","2027/28","92","","160"],
    [881,"AR7","Final","2025-12-08 00:00:00.0000000","Pot 2","Dedicated Biomass with CHP","2028/29","238","",""]
]}