<row _id="178"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Advanced Conversion Technology with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.635</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1065000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.770</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.081</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="179"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Energy from Waste with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.635</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>5500000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.850</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.092</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="180"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Anaerobic Digestion (&gt;5MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1750000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.840</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.099</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="181"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Biomass Conversion</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>360000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.650</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.082</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="182"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Geothermal with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2650000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.910</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.187</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="183"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Hydroelectricity</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1630000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.340</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.042</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="184"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Anaerobic Digestion with CHP (&gt;5MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1750000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.840</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.113</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="185"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Dedicated Biomass with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2700000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.900</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.105</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="186"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Offshore Wind Round 2</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>24</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2050000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.380</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.083</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="187"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Tidal Stream</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2900000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.310</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.062</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="188"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Offshore Wind Round 3 STW</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>24</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2050000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.390</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.086</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="189"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Sewage Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2300000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.510</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.056</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="190"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Advanced Conversion Technology</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.500</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4010000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.832</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.079</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="191"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Advanced Conversion Technology with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.500</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4010000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.832</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.096</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="192"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Onshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1130000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.280</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.061</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="193"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Solar Photovoltaic</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>3</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1000000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.110</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.044</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="194"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Anaerobic Digestion with CHP (&gt;5MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3250000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.791</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.105</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="195"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Tidal Stream</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2885000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.308</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.099</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="196"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Dedicated Biomass with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3495000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.804</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.094</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="197"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Geothermal with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2080000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.912</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.187</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="198"><Auction>AR3</Auction><Version>Final</Version><Publication_Date>2019-05-01 00:00:00.0000000</Publication_Date><Technology>Advanced Conversion Technology</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.500</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4300000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.832</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.064</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>3.00</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/04/2018 to 31/03/2019</Initial_Balancing_System_Charge_Window></row>
<row _id="199"><Auction>AR3</Auction><Version>Final</Version><Publication_Date>2019-05-01 00:00:00.0000000</Publication_Date><Technology>Anaerobic Digestion (&gt;5MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3580000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.791</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.074</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>3.00</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/04/2018 to 31/03/2019</Initial_Balancing_System_Charge_Window></row>
<row _id="200"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Geothermal</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2080000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.912</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.172</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="201"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>24</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2250000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.477</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.076</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="202"><Auction>AR3</Auction><Version>Final</Version><Publication_Date>2019-05-01 00:00:00.0000000</Publication_Date><Technology>Geothermal</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2255000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.910</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.142</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>3.00</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/04/2018 to 31/03/2019</Initial_Balancing_System_Charge_Window></row>
<row _id="203"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Advanced Conversion Technology</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.500</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3285000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.707</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.073</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="204"><Auction>AR3</Auction><Version>Final</Version><Publication_Date>2019-05-01 00:00:00.0000000</Publication_Date><Technology>Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>24</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1630000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.563</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.056</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>3.00</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/04/2018 to 31/03/2019</Initial_Balancing_System_Charge_Window></row>
<row _id="205"><Auction>AR3</Auction><Version>Final</Version><Publication_Date>2019-05-01 00:00:00.0000000</Publication_Date><Technology>Tidal Stream</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2935000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.350</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.077</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>3.00</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/04/2018 to 31/03/2019</Initial_Balancing_System_Charge_Window></row>
<row _id="206"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Dedicated Biomass with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4020000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.803</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.082</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="207"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Energy from Waste with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.490</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>7800000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.814</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.068</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="208"><Auction>AR3</Auction><Version>Final</Version><Publication_Date>2019-05-01 00:00:00.0000000</Publication_Date><Technology>Remote Island Wind (&gt;5MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1090000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.433</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.049</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>3.00</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/04/2018 to 31/03/2019</Initial_Balancing_System_Charge_Window></row>
<row _id="209"><Auction>AR3</Auction><Version>Final</Version><Publication_Date>2019-05-01 00:00:00.0000000</Publication_Date><Technology>Wave</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3285000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.300</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.077</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>3.00</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/04/2018 to 31/03/2019</Initial_Balancing_System_Charge_Window></row>
<row _id="210"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Geothermal</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2230000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.910</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.144</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="211"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Remote Island Wind (&gt;5 MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1025000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.465</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.049</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="212"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Hydro (&gt;5MW and &lt;50MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1690000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.035</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.045</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="213"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>24</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1305000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.607</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.057</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="214"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Solar PV (&gt;5MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>3</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>395000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.108</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.045</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="215"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Tidal stream</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2750000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.350</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.078</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="216"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Landfill Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>6</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1130000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.581</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.055</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="217"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Onshore Wind (&gt;5MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>955000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.381</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.047</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="218"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Advanced Conversion Technology</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.500</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3245000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.707</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.073</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="219"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Geothermal</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2215000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.912</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.144</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="220"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Anaerobic Digestion (&gt;5 MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3580000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.791</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.075</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="221"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Energy from Waste with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.490</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>7735000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.814</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.068</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="222"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Landfill Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>6</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1130000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.581</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.055</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="223"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>24</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1270000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.615</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.057</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="224"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Dedicated Biomass with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4010000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.803</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.082</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="225"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Floating Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3195000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.590</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.070</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="226"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Remote Island Wind (&gt;5 MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>980000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.465</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.049</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="227"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Advanced Conversion Technology</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.500</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3965000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.707</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.073</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="228"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Sewage Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2390000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.460</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.059</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="229"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Tidal stream</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2665000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.350</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.078</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="230"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Dedicated Biomass with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4935000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.803</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.082</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="231"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Energy from Waste with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.490</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>9530000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.814</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.068</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="232"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Solar PV (&gt;5MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>3</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>360000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.108</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.045</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="233"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Wave</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2905000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.300</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.077</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="234"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Geothermal</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3925000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.904</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.156</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="235"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Remote Island Wind (&gt;5 MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1140000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.448</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.047</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="236"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Hydro (&gt;5MW and &lt;50MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2085000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.350</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.045</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="237"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>24</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1540000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.623</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.057</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="238"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Solar PV (&gt;5MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>3</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>445000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.108</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.045</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="239"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Tidal stream</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>6040000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.370</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.078</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="240"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Landfill Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>6</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1390000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.581</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.055</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="241"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Onshore Wind (&gt;5MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1140000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.448</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.047</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="242"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Advanced Conversion Technology</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.500</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4030000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.707</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.086</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="243"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Geothermal</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4030000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.904</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.156</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="244"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Anaerobic Digestion (&gt;5 MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4525000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.791</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.065</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="245"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Energy from Waste with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.490</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>9755000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.814</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.076</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="246"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Landfill Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>6</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1430000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.581</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.065</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="247"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>24</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1535000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.486</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.072</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="248"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Dedicated Biomass with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>5050000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.803</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.067</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="249"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Floating Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3570000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.479</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.093</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="250"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Remote Island Wind (&gt;5 MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1295000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.360</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.062</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="251"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Geothermal</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2250000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.910</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.172</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="252"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Sewage Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3020000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.460</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.057</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="253"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Tidal stream</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>6195000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.370</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.086</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="254"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Solar PV (&gt;5MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>495000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.122</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.060</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="255"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Wave</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3330000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.300</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.097</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="256"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Wave</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>6900000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.310</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.071</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="257"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Advanced Conversion Technology</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>0.635</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1065000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.870</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.091</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="258"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Wave</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3355000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.300</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.094</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="259"><Auction>AR1</Auction><Version>Final</Version><Publication_Date>2014-08-29 00:00:00.0000000</Publication_Date><Technology>Landfill Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>6</Target_Commissioning_Window(months)><Longstop_Period(months)>6</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1030000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.580</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.047</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>1.68</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/08/2013 to 31/07/2014</Initial_Balancing_System_Charge_Window></row>
<row _id="260"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Anaerobic Digestion (&gt;5 MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3580000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.791</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.075</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="261"><Auction>AR2</Auction><Version>Final</Version><Publication_Date>2017-03-13 00:00:00.0000000</Publication_Date><Technology>Anaerobic Digestion (&gt;5MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3250000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.791</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.087</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>2.34</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/02/2016 to 31/01/2017</Initial_Balancing_System_Charge_Window></row>
<row _id="262"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Sewage Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2390000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.460</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.059</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="263"><Auction>AR3</Auction><Version>Final</Version><Publication_Date>2019-05-01 00:00:00.0000000</Publication_Date><Technology>Dedicated Biomass with CHP</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Applies</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4030000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.803</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.081</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>3.00</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/04/2018 to 31/03/2019</Initial_Balancing_System_Charge_Window></row>
<row _id="264"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Hydro (&gt;5MW and &lt;50MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1690000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.350</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.045</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="265"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Floating Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3845000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.547</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.070</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="266"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Anaerobic Digestion (&gt;5 MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Applies</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>4410000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.791</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.075</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="267"><Auction>AR4</Auction><Version>Final</Version><Publication_Date>2021-11-25 00:00:00.0000000</Publication_Date><Technology>Wave</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3030000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.300</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.077</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP>4.29</Initial_Balancing_System_Charge_GBP><Initial_Balancing_System_Charge_Window>01/10/2020 to 30/09/2021</Initial_Balancing_System_Charge_Window></row>
<row _id="268"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Sewage Gas</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Applies</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2945000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.460</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.059</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="269"><Auction>AR5</Auction><Version>Final</Version><Publication_Date>2023-03-16 00:00:00.0000000</Publication_Date><Technology>Onshore Wind (&gt;5MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>925000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.381</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.047</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="270"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Hydro (&gt;5MW and &lt;50MW)</Technology><Baseload_Intermittent>Baseload Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>2140000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.350</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.067</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="271"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Floating Offshore Wind</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3480000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.556</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.070</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="272"><Auction>AR6</Auction><Version>Final</Version><Publication_Date>2024-03-06 00:00:00.0000000</Publication_Date><Technology>Wave</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>3405000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.300</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.077</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>
<row _id="273"><Auction>AR7</Auction><Version>Final</Version><Publication_Date>2025-07-24 00:00:00.0000000</Publication_Date><Technology>Onshore Wind (&gt;5MW)</Technology><Baseload_Intermittent>Intermittent Market Reference Price</Baseload_Intermittent><RQM>Does not apply</RQM><Assumed_RQM>1.000</Assumed_RQM><CHPQM>Does not apply</CHPQM><Sustainability>Does not apply</Sustainability><Target_Commissioning_Window(months)>12</Target_Commissioning_Window(months)><Longstop_Period(months)>12</Longstop_Period(months)><Total_Project_Pre_Commissioning_Costs_GBP>1295000</Total_Project_Pre_Commissioning_Costs_GBP><Assumed_Load_Factor>0.360</Assumed_Load_Factor><Post-Tax_Real_Discount_Rate>0.062</Post-Tax_Real_Discount_Rate><Initial_Balancing_System_Charge_GBP /><Initial_Balancing_System_Charge_Window /></row>