Last Updated |
July 12, 2025, 02:12 (UTC)
|
Created |
June 13, 2025, 12:00 (UTC)
|
Cars Off Road Equivalent Per Annum |
This is a calculation of the equivalent number of cars that would need to be removed from the roads, on an annual basis, to have the same impact as the Greenhouse Gas emissions avoided by the CfD project being operational for a year, in comparison to non-green energy generation. This is based on Average CO2 emissions per car per year in the UK of 1,393,920 grams of CO2 (Source : Average CO2 Emissions per Car in the UK | NimbleFins) |
CfD Allocation Postcode |
For non-offshore projects this is the postcode of the CfD project. For offshore projects, which do not have a postcode, this is the postcode of the CfD project's onshore substation. |
CfD Name |
The name of the CfD project. |
Constituency |
The constituency where the CfD project is located, based on the postcode of the CfD project (Source - Postcode Converter - UK Parliamentary Constituencies) |
Country |
The country where the CfD project is located, based on the postcode of the CfD project. |
Expected Operational Start Date |
For projects which are, as yet, non-operational this is the current estimated start date of when they will commence generation under the terms of their CfD agreement. |
Generation Last Year (MWh) |
The Generation of the CfD project in the last year, or part thereof if the project commenced generation within the last year, and is measured in MWh. |
Generation since Start (MWh) |
The total Generation since the CfD project started generation under the terms of their CfD agreement and is measured in MWh. |
Homes Powered Equivalent Per Annum |
This is a calculation of the equivalent number of homes which could be powered for a year by the annual generation of each CfD project. This is based on a Typical Domestic Consumption Value of 2,700 kWh as per Ofgem's estimation - Average gas and electricity usage | Ofgem |
MP Name |
The Member of Parliament for the constituency where the CfD project is located, based on the postcode of the CfD project. (Source - Parliamentary Contact Details for MPs ) |
Maxiunum Contract Capacity (MW) |
The maximum amount of electricity a renewable energy project can generate at a given moment, measured in megawatts (MW). |
Operational Start Date |
The date that a CfD project became operational, and therefore started generating under the terms of their CfD agreement. |
Party |
The political party associated with the constituency where the CfD project is located. (Source - Parliamentary Contact Details for MPs ) |
Region |
The geographical region where the CfD project is located, based on the postcode of the CfD project. |
Technology Type |
The technology type associated with the CfD Project. |
Total GHG Avoided (TCO2e) |
We calculate the total electricity generated by CfD-supported power plants (e.g., wind farms) and estimate their carbon emissions across their entire lifecycle, from construction to decommissioning. These emissions are compared to the amount of carbon the National Grid would emit to produce the same amount of electricity. The difference gives the avoided emissions achieved by the CfD portfolio. |